Biothane Lead | Any Condition or Terrain Lead - Ray Allen Manufacturing

Biothane Lead

Ray Allen Manufacturing

$30.99 - $34.99
SKU: 8572-P

All Weather Leash | Durable Leather Alternative | Easy Cleaning

The Biothane Lead is impervious to water and ice and is fully functional in any conditions or terrain. As a durable leather alternative, they are easy to clean and mildew resistant. If the lead drops into a puddle, lake, or river just grab it and go!

These 6 foot leads are thoroughly tested by professional dog handlers and trainers - requiring no maintenance, while remaining clean of stickers, thorns and goatheads.

Product Features
  • Impervious to water and ice, and fully functional in any condition or terrain
  • Durable leather alternative
  • Thoroughly tested by professional dog handlers and trainers
  • Require no maintenance
  • Made in USA
Available Widths
  • 6' x 1/2" wide (500-pound tensile strength)
  • 6' x 3/4" wide (750-pound tensile strength)

Our Lifetime Biothane Products Warranty: We guarantee the materials and craftsmanship of our biothane products for life. If your Ray Allen Manufacturing biothane product is defective or breaks down due to normal wear and tear we will repair or replace it. Normal wear and tear does not cover dog chewing, straight cuts, or any other activity that is deemed outside the scope of designed use. This will be deemed by us at our sole discretion upon inspection.

Our biothane product lines include the brands Ray Allen Manufacturing and Signature K9.

Our Belief: Ray Allen Manufacturing has for decades offered finely crafted products for the Professional K9 market. Our belief in our craftsmanship and quality of materials allows us to offer some of the best warranties in the industry. Due to the diverse nature of our product line we have categorized our warranty information. You can find warranty information for our other products here.

Extra Information: Our warranty only covers products purchased directly from Ray Allen Manufacturing and our subsidiaries, Signature K9 and J&J Dog Supplies. Items purchased from authorized dealers or other sources will not be covered by Ray Allen Manufacturing directly, instead the item must be returned to the source of the purchase.

Material:
Biothane
Origin:
Made in USA
Color:
Gray, Coyote, Orange, Red, Blue, Sky Blue, Teal, Hunter Green, Neon Green, Lime Green, Pink, Purple

WARNING: This product can expose you to chemicals, which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov .

Gear in the Wild

Tag @RayAllenK9 on Instagram with #RayAllenGear to join the pack and get featured here!