Your company account is blocked and you cannot place orders. If you have questions, please contact your company administrator.

33 Foot Biothane Long Lead

Rating:
50% of 100
$54.99 54.99
SKU
8433
Biothane tracking lines will prevent your tracking dog from getting caught in brush, debris, or tangled in rocks, bushes or trees.
Track with the best line available. Biothane tracking lines will prevent your tracking dog from getting caught in brush, debris, or tangled in rocks, bushes or trees. The round, lightweight yet incredibly strong design is hassle and maintenance free. Equipped with a 1/2" Solid brass bolt snap for the thinner lead, and a 5/8" solid Brass bolt snap for the thicker lead.
Available in Black and Orange
  • 1/4" or 5/16" diameter
  • 500 pound tensile strength for 1/4" Lead
  • 800 pound tensile strength for 5/16" Lead
  • 33 ft. length
Write Your Own Review
You're reviewing:33 Foot Biothane Long Lead
Your Rating
Thank you for visiting our store

We notice you have the AdBlocker extension enabled. We do not serve ads, but this extension could cause issues with your experience on our website. Please turn off AdBlocker to continue.

X